Platinum Mining Solutions

Platinum Extraction Planning Tools

Design platinum mining operations from drillhole data to production schedule. Kriging, pit optimization, and equipment allocation included.

Platinum Mining Solutions

Complete software solution for platinum mining from geological modeling through production management for PGM operations.

K-MINE supports platinum producers with integrated tools for multi-element resource estimation, mine design, and scheduling. Plan extraction for layered intrusion deposits optimizing Pt, Pd, Rh, and base metal recovery.

Open Pit Mining

Geology, design, scheduling, drill & blast, and surveying connected in one platform. From drillhole data to production schedule.

view all products

Underground Mining

Stope optimization, decline design, ventilation, and development planning in a single environment. One database, full workflow.

view all products

Need to use multiple software solutions?

Geology to Scheduling in One Platform

Problems with import/export?

Industry-Standard File Formats

Scattered data?

PostgreSQL Database with Multi-User Access

Long-term commitments and fines?

Flexible Subscription, No Lock-In

Long-term Partners