Mine Production Scheduling Software

Short-Term and Long-Term Production Scheduling

Build period-by-period extraction schedules with equipment constraints, haulage limits, and blending targets. Visualize Gantt charts and tonnage profiles.

K-MINE production scheduling builds period-by-period extraction plans with equipment capacity, haulage distance, and blending constraints applied simultaneously across multiple mining areas. Visualize extraction sequences on Gantt charts, tonnage-grade profiles, and equipment utilization dashboards. Compare scheduling scenarios side by side to identify the plan that delivers the best NPV while maintaining operational feasibility and regulatory compliance.

Solution Finder Algorithm

Automated scheduling optimization that generates production sequences based on constraints and targets.

All Planning Horizons

From annual strategic plans to monthly and weekly operational schedules in one environment.

Equipment Management

Assign excavators, configure maintenance windows, and define shift patterns for realistic schedules.

Grade Blending

Blend material from multiple mining areas through stockpiles to meet plant feed quality targets.

Constraint Handling

Apply production limits, equipment availability, transport capacity, and quality requirements to every period.

Results Visualization

View schedules as Gantt charts, tonnage graphs, and 3D mining progression for any time interval.

Learn more about K-MINE Scheduling module

Long-term Partners