Import Data from Deswik to K-MINE

Seamless Deswik Data Migration

Migrate your Deswik scheduling data, block models, and underground designs into K-MINE. Retain your life-of-mine plans and activity networks while moving to an all-in-one mining platform.

Import Data from Deswik to K-MINE

Bring your Deswik.CAD designs, Deswik.Sched activity networks, block models, and development layouts into K-MINE without rebuilding complex scheduling logic or underground geometries from scratch. Preserve dependency chains, equipment assignments, and production targets while gaining integrated geological modelling capabilities Deswik does not natively provide.

K-MINE imports standard Deswik exchange formats including CSV schedules, DXF design strings, and block model tables. Once migrated, all data links directly to resource estimation, stope optimisation, open-pit design, calendar-based scheduling, and compliance reporting — replacing the separate Deswik.CAD, Deswik.Sched, and Deswik.MDM modules with a single continuous workflow.

Open Pit Mining

Geology, design, scheduling, drill & blast, and surveying connected in one platform. From drillhole data to production schedule.

view all products

Underground Mining

Stope optimization, decline design, ventilation, and development planning in a single environment. One database, full workflow.

view all products

Need to use multiple software solutions?

Geology to Scheduling in One Platform

Problems with import/export?

Industry-Standard File Formats

Scattered data?

PostgreSQL Database with Multi-User Access

Long-term commitments and fines?

Flexible Subscription, No Lock-In

Long-term Partners