Learning Center / Webinars

Higher Grade, Lower Value. How Is That Possible?

A polymetallic ore block appears 15% better on a copper-equivalent basis. But once recovery is included, the ranking flips. In this K-MINE webinar clip, see why the copper-rich block yields approximately $149 per tonne in recovered value compared with $143 per tonne for the polymetallic block, and what this means for pit optimization and mine planning.

Video transcription

How Accurate Is Copper Equivalent Grade?

So the practical takeaway is very simple.

When someone tells you this deposit is 1.4% copper equivalent, the first question should be: based on what?

So let's make that a little more concrete, because a 48% difference can sound theoretical until it actually changes a decision.

Comparing Two Ore Blocks Using Copper Equivalent

Imagine we have two blocks.

The first is very simple, about 1.4% copper, with almost nothing else.

The second is much more polymetallic, lower copper, but it also contains gold, silver, zinc, and some lead.

Now let's value both blocks using the price-only formula.

The polymetallic block comes out at 1.61% copper equivalent, compared with 1.40% for the copper block.

So based on that number, the polymetallic block looks about 15% better. You would probably send it to the plant first.

How Metal Recovery Changes Ore Block Valuation

But now let's include recovery.

And suddenly, the result flips.

The copper block becomes the better block.

And if we look at the actual recovered value, using the prices in this model, the copper block is worth about $149 per tonne, while the polymetallic block is around $143.

So we're talking about almost $6 per tonne difference.

Same two blocks. Same prices. Same day.

But depending on the formula, you get the opposite answer to a very basic planning question: which block has actually better ore?

Why Copper Equivalent Needs Economic Context

And that brings us to an important point.

Copper equivalent is not something we physically measure. Nobody goes into the field and measures 1.4% CuEq.

It is a calculated value.

And behind that value is a set of assumptions about prices, recoveries, and which metals we decide to count.

So whenever we use an equivalent grade, those assumptions need to travel with the number.