Import Data from Micromine to K-MINE
Seamless Micromine Data Migration
Transfer your Micromine drillhole databases, block models, and wireframes into K-MINE. Preserve your resource estimates and geological interpretations while switching to a fully integrated mining platform.
Move your Micromine drillhole projects, block models, wireframe surfaces, and grade-control data into K-MINE without rebuilding geological interpretations from scratch. Retain validated resource classifications, variogram models, and estimation parameters while gaining a single-platform workflow from exploration to mine closure.
K-MINE accepts standard Micromine export formats including CSV drillhole tables, block model files, and DXF wireframes. Once imported, all datasets connect natively to geostatistical estimation, pit optimisation, stope design, scheduling, and compliance reporting — eliminating the file-conversion steps and third-party plugins that Micromine workflows often require.
Open Pit Mining
Geology, design, scheduling, drill & blast, and surveying connected in one platform. From drillhole data to production schedule.
view all productsUnderground Mining
Stope optimization, decline design, ventilation, and development planning in a single environment. One database, full workflow.
view all productsNeed to use multiple software solutions?
Geology to Scheduling in One Platform
Problems with import/export?
Industry-Standard File Formats
Scattered data?
PostgreSQL Database with Multi-User Access
Long-term commitments and fines?
Flexible Subscription, No Lock-In
K-MINE Software
Geological modeling to production scheduling — one database, connected workflow
One database, full workflow — from drillhole to production schedule. Stope optimization, decline design, and ventilation in one environment.
Surveying
Process field data, build surfaces, and reconcile volumes for open pit operations.
Geology
Turn drillhole data into 3D domains and grade estimates.
Open Pit Design
Pit shells, benches, ramps, and haul roads in one design environment
Scheduling
Build short-, mid-, and long-term schedules with equipment assignment.
Pit Optimizer
Select ultimate pit limits and phase shells using economic inputs.
Stability Analysis
Assess pit slope stability with limit equilibrium and FEM workflows.
Drill and Blast
Design patterns, calculate charges, and validate blasts before execution.
Infrastructure
Maintain a 3D master plan for haul roads, waste dumps, stockpiles, and site facilities.
Long-term Partners
Learning Resources
View AllExplore our latest Videos, Webinars, Trainings, and Articles to strengthen your mining
workflows - whether you are a practicing engineer, an academic, or a student.
Sep 8, 2026
Company NewsInnovations in Resource Estimation: K-MINE at the KAZ Minerals Geological Forum 2026
Sep 8, 2026
Feature HighlightsHeterogeneous Rock Mass Stability Analysis in K-MINE
Aug 26, 2026
Feature HighlightsFinite Element Stability Analysis in K-MINE
Aug 21, 2026
Webinars