Import Data from Surpac to K-MINE
Seamless Surpac Data Migration
Transfer your Surpac geological models, block models, and string files into K-MINE. Modern interface, same data - no rework required.
Transfer your Surpac geological models, block models, string files, and drillhole databases into K-MINE without rebuilding projects from scratch. Preserve years of interpretation work while upgrading to a modern integrated platform.
K-MINE reads standard exchange formats used by Surpac including CSV block models, DXF design strings, and drillhole tables. Once imported, your data connects directly to resource estimation, pit design, scheduling, and reporting modules - the full geology-to-production workflow that Surpac requires separate tools to achieve.
Open Pit Mining
Geology, design, scheduling, drill & blast, and surveying connected in one platform. From drillhole data to production schedule.
view all productsUnderground Mining
Stope optimization, decline design, ventilation, and development planning in a single environment. One database, full workflow.
view all productsNeed to use multiple software solutions?
Geology to Scheduling in One Platform
Problems with import/export?
Industry-Standard File Formats
Scattered data?
PostgreSQL Database with Multi-User Access
Long-term commitments and fines?
Flexible Subscription, No Lock-In
K-MINE Software
Geological modeling to production scheduling — one database, connected workflow
One database, full workflow — from drillhole to production schedule. Stope optimization, decline design, and ventilation in one environment.
Surveying
Process field data, build surfaces, and reconcile volumes for open pit operations.
Geology
Turn drillhole data into 3D domains and grade estimates.
Open Pit Design
Pit shells, benches, ramps, and haul roads in one design environment
Scheduling
Build short-, mid-, and long-term schedules with equipment assignment.
Pit Optimizer
Select ultimate pit limits and phase shells using economic inputs.
Stability Analysis
Assess pit slope stability with limit equilibrium and FEM workflows.
Drill and Blast
Design patterns, calculate charges, and validate blasts before execution.
Infrastructure
Maintain a 3D master plan for haul roads, waste dumps, stockpiles, and site facilities.
Long-term Partners
Learning Resources
View AllExplore our latest Videos, Webinars, Trainings, and Articles to strengthen your mining
workflows - whether you are a practicing engineer, an academic, or a student.
Sep 8, 2026
Company NewsInnovations in Resource Estimation: K-MINE at the KAZ Minerals Geological Forum 2026
Sep 8, 2026
Feature HighlightsHeterogeneous Rock Mass Stability Analysis in K-MINE
Aug 26, 2026
Feature HighlightsFinite Element Stability Analysis in K-MINE
Aug 21, 2026
Webinars