Real deposits rarely have uniform geotechnical conditions. Why should your pit design? The latest K-MINE Dynamic Design update lets you adapt slope angles and berm widths to different rock types, define complex geotechnical zones, and create smooth transitions between them. See how polylines, block models, and wireframes bring open pit design closer to real mining conditions.
Video transcription
New Geotechnical Capabilities in K-MINE Dynamic Design
Welcome! In this video, we'll share new ways to describe geotechnical conditions as close to reality as possible. You'll see how accurately you can now reproduce real mining conditions.
When a pit doesn't need special conditions in different zones, the design is simple. But as soon as something like a variable pit wall slope angle comes in, things get complicated.
Not anymore. We've added multiple combinations to describe unique geotechnical conditions and incorporate them into open pit mine design.
Defining Geotechnical Zones Using Polylines
Let's start with the simplest option — a polyline.
Outline the area and set the conditions inside it: slope angles and berm widths for each bench.
We put a lot of work into making the transitions between geotechnical zones smooth, just as stability and design requirements demand.
Grouping Polylines and Smoothing Transitions
This time, we went further: polylines can now be combined into groups.
Each group follows the same rules as a single polyline. Smoothing parameters ensure smooth transitions between zones.
If you need to modify certain areas, you can easily add new geotechnical zones to the existing list. Select a new set of polylines, click “Edit lines,” recalculate, and enjoy the result.
Using Block Models to Define Slope Angles and Berm Widths
Now for the heavy artillery. You can use a block model to determine slope angles and berm widths.
There are two ways to do this:
- Using existing block model fields.
- Defining rules based on rock types, geological domains, or other attributes.
Let's start with the prepared fields. After selecting the block model, choose the required fields from the drop-down lists, such as Slope and Berm.
The “Block parameters” command displays the properties of any block directly within the same working environment.
Different blocks can have different slope angles and berm widths, and the corresponding values immediately appear in the table below.
Methods for Selecting Geotechnical Parameters
For blocks with conflicting geotechnical parameters, several resolution methods are available:
- Weakest rock — the most commonly used approach.
- Dominant height.
- Average bench height.
- Weighted average.
Choose the appropriate method based on your geotechnical conditions and safety requirements.
You can also visualize the criteria used to determine pit wall parameters in a cross-section for each bench. Simply select the required bench and review the results.
The result is the same open pit, but with different geotechnical conditions incorporated into its geometry. In some areas, the pit wall intersects weaker rock, while in others, it intersects stronger rock.
Defining Geotechnical Rules by Rock Type
Next, let's define design rules using a list.
Select the material class attribute, assign the appropriate parameters to each rock type, and run the calculation.
The result demonstrates a close match with the specified geotechnical conditions.
Using Wireframes to Model Complex Geotechnical Zones
The next geotechnical element is particularly useful in the most challenging mining conditions: wireframes.
Wireframes are a valuable tool for geotechnical engineers when describing zones of unstable rock.
The easiest way to create a wireframe is to use the “Extrude wireframe” command.
Add as many wireframes as your project requires. Just like polylines, wireframes can also be combined into groups.
Design rules work in the same way as for polylines. Geotechnical conditions can be defined for individual wireframes on selected benches or across their entire extent.
You can also show or hide the virtual lines used to define geotechnical zones.
Applying Geotechnical Design Rules Outside Wireframes
Finally, there is another way to define design rules using wireframes — this time outside the wireframe rather than inside it.
This provides a simple setup for complex geotechnical conditions.
Keep in mind that applying geotechnical zones may slightly shift some haul roads. Make sure to review their positions and align them with each other.
In our example, changing the road's starting point is enough.
More Flexible and Realistic Open Pit Mine Design
The updated K-MINE Dynamic Design toolset covers most complex geotechnical conditions while keeping the design process clear and intuitive.
By combining polylines, block models, and wireframes, mining engineers can adapt pit geometry to varying rock properties, customize slope angles and berm widths, and create smooth transitions between geotechnical zones.
Try the new Dynamic Design capabilities, and may your mining projects be both profitable and safe!