K-MINE is advanced mining industry software that combines powerful geological modeling, mine planning, and operational optimization tools into a single intuitive platform. Designed specifically for both open pit and underground mining operations, K-MINE streamlines key processes including geology management, 3D mine design, strategic pit optimization, drill and blast planning, and precise short-to-long-term scheduling.
Featuring an easy-to-use interface, K-MINE enables mining engineers and planners to rapidly analyze geological data, optimize mine designs, and generate accurate, actionable schedules. Automated workflows and built-in analytical tools enhance productivity, reduce operational risks, and improve economic outcomes.
Open Pit Mining
Explore comprehensive solutions tailored to optimize open pit operations, boost productivity, and maximize profitability.
Underground Mining
Unlock powerful tools designed for precise planning, efficient operation, and enhanced safety in underground mining.

Need to use multiple software solution?
One-Stop Shop Solution

Problems with
import/export?
Supporting Any Kind
of Files and Data

Scattered date?
Single Database with Remote Access

Longterm
commitments and fines
Flexible Subscription with No Commitments
Surveying
Efficient management and analysis of surface survey data with detailed topographic modeling.
Geology
Advanced 3D geological modeling and accurate resource estimation.
Open Pit Design
Dynamic tools for efficient pit, ramp, and infrastructure design.
Pit Optimizer
Strategic optimization of pit boundaries for maximum profitability.
Scheduling
Comprehensive short-, mid-, and long-term mine scheduling.
Drill & Blast Design
Precision drilling and blasting design to optimize efficiency and safety.
Stability Analysis
Slope stability assessments ensuring safe mining operations.
Infrastructure
Interactive digital master planning and management of surface mine infrastructure and utilities.
Underground Design
Automated design tools optimizing tunnels, shafts, and underground structures.
Underground Surveying
Precise underground surveying with automated 3D modeling and volume calculations.
Stope Optimization
Efficient determination of optimal stope boundaries to maximize ore recovery.
Ventilation
Comprehensive ventilation network modeling for safe underground operations.
Learning Recources
Discover how to analyze and present scheduling results in K-MINE for effective mine planning. Learn to export wireframes, generate charts, and create detailed reports for optimized mining operations.Introduction to Scheduling Results Analysis In this video, we...
Analyzing Results in the Scheduling Module for Better Planning
[ba_dual_button btn_a_text="Join via LinkedIn" btn_a_link="https://www.linkedin.com/events/7416533184684646400" btn_a_link_target="_blank" btn_b_text="Join via YouTube" btn_b_link="https://www.youtube.com/live/OgdLV4Dne3I?si=ujmvwB5t638wlajB"...
Webinar: K-MINE 2026 – One Software Platform for Mining Industry
This applied online session focuses on practical open-pit design workflows and short-term planning using K-MINE. Participants will walk through design logic, interactions between long-, medium- and short-term schedules, and the transition rules that keep production...
Open-Pit Design and Short-Term Planning with K-MINE | Online Training Session
In mining, it is surprisingly easy to look successful while quietly destroying value. Production is up. Cash cost per tonne is down. Quarterly EBITDA looks great. The board is happy, management gets their bonus, investors see green numbers. And yet, five years later,...











