Mine Ventilation Software
Airflow Simulation and Fan Selection
Model underground ventilation networks, calculate airflow distribution, and select fan configurations. Analyze contaminant dispersion and heat load for regulatory compliance.
K-MINE ventilation modeling simulates underground airflow networks, calculates pressure drops across branches, and evaluates fan duty points for primary and auxiliary ventilation systems.
Analyze contaminant dispersion, heat and humidity buildup, and diesel particulate dilution to ensure regulatory compliance. Model ventilation scenarios for mine expansion, emergency response, and seasonal variation to maintain safe working conditions throughout the underground operation.
Open Pit Mining
Geology, design, scheduling, drill & blast, and surveying connected in one platform. From drillhole data to production schedule.
view all productsUnderground Mining
Stope optimization, decline design, ventilation, and development planning in a single environment. One database, full workflow.
view all productsNeed to use multiple software solutions?
Geology to Scheduling in One Platform
Problems with import/export?
Industry-Standard File Formats
Scattered data?
PostgreSQL Database with Multi-User Access
Long-term commitments and fines?
Flexible Subscription, No Lock-In
K-MINE Software
Geological modeling to production scheduling — one database, connected workflow
One database, full workflow — from drillhole to production schedule. Stope optimization, decline design, and ventilation in one environment.
Surveying
Process field data, build surfaces, and reconcile volumes for open pit operations.
Geology
Turn drillhole data into 3D domains and grade estimates.
Open Pit Design
Pit shells, benches, ramps, and haul roads in one design environment
Scheduling
Build short-, mid-, and long-term schedules with equipment assignment.
Pit Optimizer
Select ultimate pit limits and phase shells using economic inputs.
Stability Analysis
Assess pit slope stability with limit equilibrium and FEM workflows.
Drill and Blast
Design patterns, calculate charges, and validate blasts before execution.
Infrastructure
Maintain a 3D master plan for haul roads, waste dumps, stockpiles, and site facilities.
Long-term Partners
Learning Resources
View AllExplore our latest Videos, Webinars, Trainings, and Articles to strengthen your mining
workflows - whether you are a practicing engineer, an academic, or a student.
Sep 25, 2026
Company NewsInside K-MINE: Mining Software, Engineering and Transparent Consulting
Sep 24, 2026
Company NewsK-MINE at Mining & Minerals Expo 2026 | Meet Us in Kyiv
Sep 21, 2026
Podcast$10M in a Week: What Investors Want From Junior Mining
Sep 8, 2026
Company News