ERP Titanium Mining Program
Titanium Mining Enterprise Integration
Connect geological, planning, and operational data across your titanium mining enterprise. Single source of truth for all departments.
Integrate titanium mine planning with enterprise data systems using K-MINE's connected workflow for mineral sands operations requiring multi-product grade management and separation plant feed optimization.
Share heavy mineral models, dredge or dry mining schedules, concentration plant data, and individual mineral product specifications between mine planning software and corporate ERP platforms. Maintain data consistency from geological assessment through mining, wet processing, and mineral separation into ilmenite, rutile, and zircon product streams.
Open Pit Mining
Geology, design, scheduling, drill & blast, and surveying connected in one platform. From drillhole data to production schedule.
view all productsUnderground Mining
Stope optimization, decline design, ventilation, and development planning in a single environment. One database, full workflow.
view all productsNeed to use multiple software solutions?
Geology to Scheduling in One Platform
Problems with import/export?
Industry-Standard File Formats
Scattered data?
PostgreSQL Database with Multi-User Access
Long-term commitments and fines?
Flexible Subscription, No Lock-In
K-MINE Software
Geological modeling to production scheduling — one database, connected workflow
One database, full workflow — from drillhole to production schedule. Stope optimization, decline design, and ventilation in one environment.
Surveying
Process field data, build surfaces, and reconcile volumes for open pit operations.
Geology
Turn drillhole data into 3D domains and grade estimates.
Open Pit Design
Pit shells, benches, ramps, and haul roads in one design environment
Scheduling
Build short-, mid-, and long-term schedules with equipment assignment.
Pit Optimizer
Select ultimate pit limits and phase shells using economic inputs.
Stability Analysis
Assess pit slope stability with limit equilibrium and FEM workflows.
Drill and Blast
Design patterns, calculate charges, and validate blasts before execution.
Infrastructure
Maintain a 3D master plan for haul roads, waste dumps, stockpiles, and site facilities.
Long-term Partners
Learning Resources
View AllExplore our latest Videos, Webinars, Trainings, and Articles to strengthen your mining
workflows - whether you are a practicing engineer, an academic, or a student.
Sep 8, 2026
Company NewsInnovations in Resource Estimation: K-MINE at the KAZ Minerals Geological Forum 2026
Sep 8, 2026
Feature HighlightsHeterogeneous Rock Mass Stability Analysis in K-MINE
Aug 26, 2026
Feature HighlightsFinite Element Stability Analysis in K-MINE
Aug 21, 2026
Webinars