Join our live stream on January 29th to learn more about the tools and functionality of our Pit Optimizer Module!

Live Stream: How to use K-MINE: Pit Optimizer

The stream agenda includes:

1. Preparation of the initial data to calculate the optimal contours of the mine development, including: deposit block modeling, mining technical factors (the slope angle of the pit boards for deposits areas, settings blocks correlations settings), economic parameters (the extraction price, transport, processing, and capital expenses, product price). Possibility to create user’s variables and usage of inserted formulas editors into the consideration of deposits’ work off characteristics.

2. Optimal contours calculations. Ability to create, display, convert and transform table of numbers and graphic results of the calculations.

3. Calculation of the mine development sequence. Features of parameters settings, several options of the deposit work off. Visualization of and further usage of the results.

Join the event via Linkedin: https://www.linkedin.com/events/6755084639938871296/

Join the event via Facebook: https://www.facebook.com/events/227536168865298/