×
The software solution for underground design

Underground Design
The software solution for underground design

The software system is developed to help you to design projects for underground works and solve different design tasks related to the development of a new deposit as well as the operation of your mine.

The software solution for underground design
Main Features

Design mine workings during preparatory - development operations

Design drilling and blasting of mine workings and actual mining

Realize different systems for a deposit development

Design a mine field by a deposit configuration

Schedule mining out of different workings

Design actual mining in lava and estimate of workscope, create new levels

Ring Drilling of Blocks

Keep the distance along the line of least resistance

Select the initial direction of the first drillhole

Select the drilling rig position

Limit the range of ring placement include an ore body boundary to drill through dead rock

Number drillholes automatically

Drill with specified overdrilling or underdrilling

Limit drillholes with previously mined workings

Place drillholes checkerboard while drilling out the block

Calculation of Mineral Deposit Volume and Overburden in Required Outline

Calculation of quantitative and qualitative indicators of block models based on the specified parameters

Calculation of Volume of Preparatory - Development Operations
Mine Design
Cross-sections for Drilling Holes
Setting drilling sites automatically with parameters of the blasting pattern
Designing Parameters of Block Drillholes

Designing of drillholes in the opposite phase for even and odd rings

Calculation and visualization of drillhole charges

Calculation of drillholes in rings based on the blasting pattern data such as the overdrilling, the drilling height, the drillhole spacing, etc.

Automation of Preparation and Keeping of Blasting Patterns
Drilling out with Flipped and Inclined Rings of Blind Workings
Creation of Reporting Documents for Explosion
Designing of Vertical Workings
Creating of vertical workings according to the specified parameters
Mining Cave Design

Designing caves automatically with various complexity and configuration according to the specified parameters

Automatic determination of drilling cave boundaries with drilling rig sites and ore deposit pattern

Automation of the drilling design of a separate ring and a cave in whole. While designing, you can use data on adjacent workings and mining caves.

Designing of Compensation Slots

The selection of the designing area

The placement of rows and drillholes by specified parameters

The calculation of the drillhole length and the charge

The creation of documents for drilling

Drilling out with Various Types of Drillhole Bundles
K-MINE Metrics

Production level boost

by 23%

Raising mining output

by 10-12%

67%

software cost reduction

Engineering calculations time cutback

by 40%

Inside the app:
Engineering design of capital and preparatory mine workings
Engineering design of capital and preparatory mine workings
Three-dimensional modeling of mining blocks according to the project
Three-dimensional modeling of mining blocks according to the project
Creating geological and surveying sections according to existing models
Creating geological and surveying sections according to existing models
Creating and editing data sheets for drilling and blasting works Designing and visualizing drilling and blasting works
Creating and editing data sheets for drilling and blasting works Designing and visualizing drilling and blasting works
Option to section each drilling site
Option to section each drilling site
Creating wireframe and block 3D-models of mineral deposits Combining field models with various mining positions
Creating wireframe and block 3D-models of mineral deposits Combining field models with various mining positions
Calculating explosive charges for drilled fans or beams of deep holes considering the undercharge estimated in the project
Calculating explosive charges for drilled fans or beams of deep holes considering the undercharge estimated in the project
Long time partner of
Thank you!
Your Suggestion was delievered straight to our team.