×
EN
RU UA
EN
RU UA
Open Pit Dispatch

Open Pit Dispatch

3D visualization of location, reporting, and control of equipment parameters

Open Pit Dispatch
Main functionality:

Instant online data exchange;

Visualization and monitoring of mining equipment work based on the open pit’s digital model;

Accounting of actual parameters of equipment work in real-time, prompt tracking and correction of possible deviations;

Visualization and control of the current position, compliance with routes, and traveling speed;

Ensuring the balanced load on excavation equipment, considering their technical condition;

Control over the implementation of planned indicators for the rock mass excavation;

Management and control of the movement of minerals and overburden;

Control of drilling operations;

Storage, display, and analysis of historical information for a specified period of equipment operation.

Drilling rig dispatching includes:

Loading of drill holes collar coordinates;

Loading of drill holes depths;

Loading of drill holes slope angles;

Obtaining information on selected drill holes (drill holes collar coordinates, drill holes depths, drill holes slope angles);

Obtaining the drilling energy intensity to generate a rock hardness model.

Dispatching of the mining transport complex consists of:

Data exchange with dispatching and positioning systems;

Real-time monitoring of mine equipment on an open pit digital model;

Display and analysis of historical information on the movement trajectory and equipment operation for a specified period;

Display and analysis of historical information on the volumes of shipped rock mass and equipment operation for a specified period.

Railroad complex dispatching consists of:

Data exchange with dispatching and positioning systems;

Real-time monitoring of rolling stock on a digital model;

Display and analysis of historical information on the movement trajectory and equipment operation for a specified period.

High precision positioning includes:

For selective excavation;

For drilling rig positioning.

Open Pit Dispatch

3D visualization of location, reporting, and control of equipment parameters
Open Pit Dispatch

Open Pit Dispatch
Main functionality:

Instant online data exchange;

Visualization and monitoring of mining equipment work based on the open pit’s digital model;

Accounting of actual parameters of equipment work in real-time, prompt tracking and correction of possible deviations;

Visualization and control of the current position, compliance with routes, and traveling speed;

Ensuring the balanced load on excavation equipment, considering their technical condition;

Control over the implementation of planned indicators for the rock mass excavation;

Management and control of the movement of minerals and overburden;

Control of drilling operations;

Storage, display, and analysis of historical information for a specified period of equipment operation.

Drilling rig dispatching includes:

Loading of drill holes collar coordinates;

Loading of drill holes depths;

Loading of drill holes slope angles;

Obtaining information on selected drill holes (drill holes collar coordinates, drill holes depths, drill holes slope angles);

Obtaining the drilling energy intensity to generate a rock hardness model.

Dispatching of the mining transport complex consists of:

Data exchange with dispatching and positioning systems;

Real-time monitoring of mine equipment on an open pit digital model;

Display and analysis of historical information on the movement trajectory and equipment operation for a specified period;

Display and analysis of historical information on the volumes of shipped rock mass and equipment operation for a specified period.

Railroad complex dispatching consists of:

Data exchange with dispatching and positioning systems;

Real-time monitoring of rolling stock on a digital model;

Display and analysis of historical information on the movement trajectory and equipment operation for a specified period.

High precision positioning includes:

For selective excavation;

For drilling rig positioning.

K-MINE Metrics

Production level boost

by 23%

Raising mining output

by 10-12%

67%

software cost reduction

Engineering calculations time cutback

by 40%

Inside the app:
Long time partner of
Thank you!
Your Suggestion was delievered straight to our team.